Thu, Jan 24, 2019
"All these extensions have been planned by utilising the lie-over periods of the existing trains at their respective terminating stations.
More >
Sat, Jan 19, 2019
Under this plan, illumination Lux levels will be raised to 160 in concourse area, 115 in circulating area, 150 in waiting hall, 100 in open platform areas, 200 in covered platform areas, 150 in enquiry-cum-reservation office counter, 150 in foot overbridge/sub-way areas, escalators, near lifts and stairs, besides 50 in outdoor parking areas.
Roha station has 15 KWp solar power panel generating around 65-80 KWh power daily. Earlier the electrical load of Roha station was 21 KW while the present load is only 11.81 KW, achieving 80% energy saving with solar power. The yearly saving in terms of money value will be Rs.3.54 lakh.
Sat, May 21, 2016
Though Air India is now "slowly getting back on track", a lot more needs to be done to bring back the glory of the 'Maharaja'.
By accepting cookies, you agree to the storing of cookies on your device to enhance site navigation, analyze site usage, and assist in our marketing efforts.