NTPC, Torrent Power slip after government directs gas-based power stations to operationalise plants from May 1 to June 30
The government has directed all gas-based power generating stations to operationalise their plants from May 1 to June 30 in view of rise in electricity demand due to a likely prolonged heat wave this summer. A significant portion of Gas-Based Generating Stations (GBSs) is currently unutilised, primarily due to commercial considerations.
)
Power companies such as NTPC and Torrent Power were trading lower on BSE on Monday (April 15, 2024) in the first trading session after the government directed all gas-based power generating stations to operationalise their plants from May 1 to June 30, 2024.
Here's how NTPC and Torrent Power were trading on Monday.
NTPC share price
The power PSU slipped by 2.49 per cent to the day's low of Rs 352.65 on Monday after the previous close of Rs 361.65.
The stock of the power company was trading lower by 2.12 per cent, or Rs 7.65, at Rs 354.00, at 9:42 am on Monday.
The stock's performance came after it hit a 52-week high for four consecutive sessions on April 8, 9, 10, and 12.
Torrent Power share price
The stock of the firm slipped by 4.18 per cent to the day's low of Rs 1,516.85 on Monday after closing at Rs 1,583.05 in the previous session.
The stock was trading lower by 4.34 per cent, or Rs 68.70, at Rs 1,514.35.
What is government order?
The government has directed all gas-based power generating stations to operationalise their plants from May 1 to June 30 in view of a rise in electricity demand due to a likely prolonged heat wave this summer.
A significant portion of Gas-Based Generating Stations (GBSs) is currently unutilised, primarily due to commercial considerations.
"To ensure maximum power generation from Gas-Based Generating Stations, the government has issued directions to all Gas-Based Generating Stations under Section 11 of the Electricity Act, 2003, under which the appropriate government may specify that a generating company shall, in extraordinary circumstances operate and maintain any generating station in accordance with the directions of that government," the statement said.
(With inputs from PTI)
Get Latest Business News, Stock Market Updates and Videos; Check your tax outgo through Income Tax Calculator and save money through our Personal Finance coverage. Check Business Breaking News Live on Zee Business Twitter and Facebook. Subscribe on YouTube.
RECOMMENDED STORIES

SIP Calculation at 12% Annualised Return: Rs 10,000 monthly SIP for 20 years, Rs 15,000 for 15 or Rs 20,000 for 10, which do you think works best?

FD Rates for Rs 10 lakh investment: Compare SBI, PNB, HDFC, ICICI, and Post Office 5-year fixed deposit returns

LIC Saral Pension Plan: How much should you invest one time to get Rs 64,000 annual pension for life?

SIP Calculation at 12% Annualised Return: Rs 1,000 monthly SIP for 20 years, Rs 4,000 for 5 years or Rs 10,000 for 2 years, which do you think works best?

UPS vs NPS vs OPS: Last-drawn basic salary Rs 90,000 and pensionable service 27 years? What can be your monthly pension in each scheme?

Monthly Pension Calculations: Is your basic pension Rs 26,000, Rs 38,000, or Rs 47,000? Know what can be your total pension as per latest DR rates
10:04 AM IST