Mumbai-Ahmedabad Bullet Train: Tech bids open for bridge project - Check latest news development
The National High Speed Rail Corporation Limited (NHSRCL) on Saturday said that it has opened two technical bids for construction or building of bridges for the 508 km Mumbai-Ahmedabad High Speed Rail (MAHSR) corridor in the state of Gujarat and Dadra and Nagar Haveli in which nine companies have participated.
The National High Speed Rail Corporation Limited (NHSRCL) on Saturday said that it has opened two technical bids for construction or building of bridges for the 508 km Mumbai-Ahmedabad High Speed Rail (MAHSR) corridor in the state of Gujarat and Dadra and Nagar Haveli in which nine companies have participated.
NHSRCL spokesperson Sushma Gaur said that the technical bids for contract packages of P-1(B) and P-1(C) for construction or building of bridges for the MAHSR corridor in the state of Gujarat as well union territory of Dadra and Nagar Haveli.
She said that as of now, 5 bidders for P-1 (C) whereas four bidders for P-1 (B) have submitted their bids for the package.
She said that the P-1 (C) package includes construction of bridges for double line High Speed railway for four PSC Bridges and seven steel truss bridges between Zaroli Village at Maharashtra -- Gujarat Border and Vadodara, in Gujarat and the union territory of Dadar and Nagar Haveli for the project.
Gaur said that for the P-1 (C) package, Ranjit Buildcon Limited, MG Contractors Pvt Ltd, KEC-SAM India JV and GRIL-GPT JV have participated in the technical bids.
Meanwhile, package P-1 (B) includes the construction of bridges for double line high speed railway for one PSC Bridge and four steel truss bridges between Vadodara and Ahmedabad, in Gujarat for the project.
She said that Ranjit Buildcon Limited, MG Contractors Pvt Ltd, KEC-SAM India JV and GRIL-GPT JV and URC Construction Pvt Ltd have participated in the technical bids.
Prime Minister Narendra Modi and then Japanese Premier Shinzo Abe had on September 14, 2017 laid the foundation stone for the ambitious Rs 1.08 lakh crore ($17 billion) project.
Bullet trains are expected to run at 320 km per hour covering the 508-km stretch in about two hours. In comparison, trains currently plying on the route take over seven hours to travel the distance, whereas flights take about an hour.
Get Latest Business News, Stock Market Updates and Videos; Check your tax outgo through Income Tax Calculator and save money through our Personal Finance coverage. Check Business Breaking News Live on Zee Business Twitter and Facebook. Subscribe on YouTube.
RECOMMENDED STORIES
Senior Citizen Latest FD Rates: Know what major banks like SBI, PNB, Canara Bank, HDFC Bank, ICICI Bank are providing on fixed deposits
Gratuity Calculator: Rs 38,000 as last-drawn basic salary, 5 years and 5 months of service; what will be gratuity amount?
EPFO Pension Schemes: Early pension, retirement pension, nominee pension and 4 other pension schemes that every private sector employee should know
Top 5 Small Cap Mutual Funds with best SIP returns in 1 year: See how Rs 25,000 monthly investment has grown in each scheme
Top 7 SBI Mutual Funds With Best SIP Returns in 1 Year: Rs 25,000 monthly SIP investment in No.1 fund has jumped to Rs 3,58,404
10:09 AM IST