JSW Neo Energy bags 400 MW Wind-Solar Hybrid project
JSW Energy’s subsidiary, JSW Neo Energy, has secured a 400 MW wind-solar hybrid project from MSEDCL, bringing its cumulative Phase III allocation to 600 MW. With this addition, JSW Energy’s total locked-in generation capacity has increased to 17.6 GW, including 3.2 GW of hybrid capacity.
JSW Energy on Thursday said its wholly-owned subsidiary JSW Neo Energy has secured an additional 400 MW wind-solar hybrid project from Maharashtra State Electricity Distribution Company (MSEDCL). Subsequent to this, the cumulative capacity allotted to JSW Neo under Phase- III (of MSEDCL) stood at 600 MW, a company statement said.
According to the statement, JSW Neo Energy, a wholly-owned subsidiary of JSW Energy (company), has received Letter of Award (LoA) for an additional 400 MW of Wind-Solar Hybrid Power Project under greenshoe option from MSEDCL against MSEDCL – Phase III.
The company, however, did not disclose any financial details.
Following this capacity award, the total locked-in generation capacity of JSW Energy has increased to 17.6 GW, which includes a total locked-in Hybrid capacity of 3.2 GW (including FDRE). The company expects to have an installed generation capacity of 10 GW by FY25, up from 7.5 GW currently. JSW Energy has a total locked-in generation capacity of 17.6 GW comprising 7.5 GW operational, 2.3 GW under construction across wind, thermal, and hydro, and an RE pipeline of 7.7 GW (PPAs signed for 2.3 GW).
The company also has 4.2 GWh of locked-in energy storage capacity through a battery energy storage system and hydro-pumped storage project. JSW Energy aims to reach 20 GW generation capacity and 40 GWh of energy storage capacity before 2030. It has set an ambitious target of achieving Carbon Neutrality by 2050.
Get Latest Business News, Stock Market Updates and Videos; Check your tax outgo through Income Tax Calculator and save money through our Personal Finance coverage. Check Business Breaking News Live on Zee Business Twitter and Facebook. Subscribe on YouTube.
RECOMMENDED STORIES
SIP+SWP: Rs 15,000 monthly SIP investment for 20 years and Rs 100,000 monthly income for 45 years; know how it is possible
SBI Senior Citizen FD Rates 2024: What you can get if you invest Rs 3.5 lakh, Rs 7 lakh, Rs 10.50 lakh, and Rs 14 lakh in 1-, 3-, and 5-year FDs
15x15x15 Formula: In how many years Rs 15,000 monthly SIP can grow to over Rs 1 crore; see calculations
NPS vs OPS vs UPS: On Rs 15,000 monthly contribution for 30 years, which of 3 can give highest pension? Get calculations
12:50 PM IST